90.8 F
The Villages
Friday, May 10, 2024

Lake Sumter Landing detour in place for work at Old Mill Run and Old Camp Road

Construction is taking place on the paver crossing at Old Mill Run and Old Camp Road near the Waterfront Inn.

This project will be completed in four phases. The work will consist of reworking the sidewalks at each corner of Old Mill Run and Old Camp Road and installing brick pavers inside the new concrete ribbons.

Work is taking place at Old Mill Run and Old Camp Road.
Work is taking place at Old Mill Run and Old Camp Road.

Both roads will have periodic closures while this work is completed. Those traveling in the area are asked to use caution and pay attention to all directional and detour signage. For additional information, contact District Property Management at 753-4022.

Opening up Priority Pools a bad idea

A Priority Pools member objects to the idea of opening up the paid premium pools to non-members. Read his Letter to the Editor.

A big thank you for an unknown Good Samaritan!

A Village of Dunedin resident, in a Letter to the Editor, is grateful to an unknown Good Samaritan who has restored his faith in humanity.

Joe Biden’s betrayal of Israel

In a Letter to the Editor, a Village of Pinellas resident accuses President Biden of breaking his promise to Israel.

Greenskeepers should take a trip over to Hacienda course

A Village of Osceola Hills reader was impressed with the conditions at Hacienda Hills Championship Golf Course. He is encouraging greens keepers at other courses to go over to Hacienda and take a few notes.

Buffalo Ridge makes perfect sense for location of Costco

In a Letter to the Editor, a Village of Summerhill resident contends that putting Costco at Buffalo Ridge Plaza makes perfect sense.